Two labs purchase the same reader, washer, incubator, and robot arm. One lab performs three processes simultaneously throughout the night. The second lab must stop and wait whenever a second scientist needs the reader. The hardware is the same. The scheduling method is not.

The scheduler component of a laboratory automation solution is the piece that most scientists are least aware of and most reliant upon. It determines whether a multi-instrument system runs at capacity or sits idle. Both static and dynamic scheduling play a role in laboratory automation scheduling, and finding the right balance depends on your individual needs. The scheduler is one layer of how Genera runs a multi-instrument lab.

The comparison below is drawn from Genera, Retisoft Inc.’s dynamic scheduler, developed through more than twenty years of collaboration with scientists, laboratories, and automation partners. Examples are taken from actual demonstrations conducted by Retisoft’s support and applications engineers.

People Also Ask

What is the difference between static and dynamic scheduling in lab automation?

A static scheduler determines the full sequence of movements before a run begins, and a dynamic scheduler determines during the run where best to send each plate given the current availability of resources

Which scheduling approach suits a multi-instrument lab?

Systems with shared resources executing multiple processes benefit from dynamic scheduling to maximize throughput, while static approaches work best for shorter, time-critical sequences where priority is fixed

Does dynamic scheduling cause deadlocks?

Deadlocks occur when scheduling decisions cause a plate to wait on an occupied position, and can be avoided by taking future requirements into account. Genera examines the next move by default, and look-ahead reserves extended chains of resources to avoid deadlocks.

Two Ways To Schedule An Automated Lab

Every piece of lab automation scheduling software answers the same question for each plate: what moves next, and where? The difference is when it decides the answer. A static scheduler decides before the run. A dynamic scheduler decides during it. Older platforms often sit firmly on the static side, as our comparison of Genera and legacy scheduling systems shows.

How Static Scheduling Behaves

Predictable Ordering

In a static scheduling configuration, a schedule is calculated in advance, and every step is placed in a predetermined time window.

The order of execution is fixed, and the process is easily auditable, which can be helpful if end-user approval is required

Where Deadlocks Originate

A deadlock occurs when plates are waiting to move to positions held by other plates, creating a situation in which nobody can proceed. A static schedule makes such a deadlock easily visible. Overlapping incubation or an instrument used by another researcher can throw off every subsequent step, since every plate is placed in a time window that only makes sense if it arrives at a specific moment.

A dynamic scheduler can avoid this problem by recalculating the schedule whenever an instrument is put into use. Retisoft engineers observe that a linear system where everything shares the same reader/writer must be carefully designed to prevent this kind of access conflict.

How Dynamic Scheduling Behaves

Real-time decisions occur within the execution of a run

Genera does not preschedule every action. As a run begins, the software evaluates the batches and directs each plate into the system when a resource becomes available. Decision points are made based on real-time information, such as a property of the labware or an instrument value

For example, one Retisoft example run waited on a plate with a read-ready status. The run did not resume until a human operator changed that status in the software. Once changed, the run resumed on its own, without restarting.

Resources are followed throughout the execution of a run

Genera is aware of every plate and instrument during run processing. Runs can have multiple processes running simultaneously, as long as the required resources are available. By default, Genera always looks one step ahead so the arm will not deliver a plate to a barcode reader that already has a plate waiting.

Comparing Behavior When Two Processes Compete

A fixed sequence leaves little room for work arriving mid-run. The new process waits for a gap in the plan.

In a Retisoft demonstration of Genera, a low-priority imaging workflow repeated in the background. A colleague then arrived with a precious sample unable to sit at room temperature, and scheduled it at priority 10 to start immediately. Genera finished the current plate, paused the background workflow, ran every urgent batch, and resumed the original work on its own. Batch variables returned each plate to its original shelf.Handling the switch automatically is part of how Genera takes over repetitive scheduling tasks. Nobody pulled the imager offline to feed plates by hand. Shared access like this is why scheduling software is central to lab efficiency.

Comparing Behavior When An Instrument Is Unavailable

In shared laboratory automation systems, instruments leave the run more often than plans assume. A colleague borrows a washer for a standalone experiment, or a device goes down for maintenance. A plan built around a named instrument stalls.

Genera handles this through zones. Put three identical washers in one zone, and the process asks for the first available washer instead of Washer 1. Remove one, and the run continues on the other two. The integrator behind Retisoft’s ELISA webinar described the same idea for washers: point a dispense step at two units, and whichever one is open takes the plate.

Comparing Behavior When A Batch Errors

Within a fixed timeframe, if a step is suspended, every subsequent slot is delayed. Genera considers each batch individually, and lets the operator decide to retry, ignore and continue, stop the batch, stop the process, or reschedule.

In a ten-batch run, if one plate has failed, the remaining nine will complete. If a reader rejected a plate due to a missing barcode, the operator could enter a barcode in the software and click retry to continue the run. Recovering a single batch rather than a whole run is one way how automation software reduces error in the lab.

Comparing Predictability Against Throughput

Static scheduling always performs operations in a pre-set order. This makes validation easier, but it leaves instruments waiting for their turn. Dynamic scheduling keeps instruments active, but the order of operations can vary from run to run. Keeping instruments busy is the most direct route to boosting throughput with lab automation.

Genera’s batch chart displays exactly what happened, including pauses.

If a high-priority workflow preempted a background one, you could see a gap between the third and fourth batch. This wasn’t a problem for background imaging work, but it would be for a time-sensitive assay. Choosing a dynamic scheduler laboratory comes down to one question: where does order matter more than speed?

When You Want Static Behavior

Some steps require certainty over speed. Genera lets you impose static control where the science requires it, while retaining real-time scheduling everywhere else.

Adding Look Ahead Deliberately

A look ahead tells Genera to verify that all the resources in a sequence are free before moving a plate, such as the barcode reader and the imager. The process editor highlights each with a heavy line. For incubations, a look-ahead duration marks the arm as busy until the end of the look-ahead so the plate is off the arm in time. Add look-aheads to every step, and Genera emulates a strictly sequential, static scheduler.

Sequencing With Batch Triggers

In the absence of a batch trigger, Genera will schedule as many batches into the system as there is capacity for. The previous batch complete trigger will run a single batch and then wait for the next batch. In the priority demonstration in Retisoft, this setting on the background workflow allowed the urgent workflow to step in between batches.

Linking Lanes Together

A link couples two lanes so a step waits for both plates. In a liquid transfer, the protocol only proceeds when both the sample plate and the destination plate are on deck, so that a loaded tip never hovers over an empty position. A second link disengages the lanes.

Comparison Table

FactorStatic schedulingDynamic scheduling in Genera
When decisions happenBefore the runDuring the run
Order of movesSame every runVaries with resource availability
New process mid-runWaits for a gap in the planRuns in parallel, or ahead by priority
Instrument goes offlinePlan stallsZone sends plates to another unit
One batch errorsLater slots shiftStop one batch, the rest continue
Strongest fitShort, fixed, time-critical sequencesShared systems running several processes

Choosing The Balance For Your Own Lab

Most labs land somewhere between the two. A practical approach:

  1. Start with real-time scheduling as the default for the whole process.
  2. Add look-aheads and look-ahead durations around incubations and other time-critical steps.
  3. Use the previous batch complete trigger where one shared instrument serves every batch.
  4. Link lanes wherever two plates need to meet on the same deck.
  5. Run a simulation to check the logic before committing samples.

The goal is static certainty in a few places and throughput everywhere else.

Match Your Scheduler To Your Science

Static scheduling buys predictability. Dynamic scheduling buys throughput and resilience. The strongest setups blend both: real-time decisions by default, with fixed control around the steps where timing defines the result.

Genera was designed for this balance. A systems integrator at Trent University described how Retisoft helped the team move past the restrictions of other scheduling software, with a control solution independent of the instrument vendors. If your system stalls whenever two users share it, a Genera demo with Retisoft Inc. shows how your own process would run.

Frequently Asked Questions

Is Genera a static or dynamic scheduler?

Genera is a dynamic scheduler. Plate moves are decided during the run based on resource availability, with look-aheads, batch triggers, and links adding static control where needed.

What does a look-ahead do in Genera?

A look ahead confirms resources needed by later steps are free before a plate moves. A look ahead duration reserves the arm before an incubation ends.

How does priority work in Genera?

Each scheduled process carries a priority up to 10. When processes compete for a resource, Genera serves the higher-priority process first, then resumes lower-priority work.

What happens if an instrument goes offline during a run?

If the instrument belongs to a zone with identical units, Genera sends plates to the next available instrument and the run continues.

Does dynamic scheduling work for validated processes?

Yes. Look-aheads and batch triggers enforce the order validation requires, and user roles stop operators from editing a validated process.

Contact Us
X Contact Us

    Your Information is confidential. See our Privacy Policy’s for more information.

    Book a Demo